INTELLI TRAFFIC CONTROL SYSTEM

Members:

Nisheeth Gupta (MEC 08)
Nitin Kumar (MEC 08)
Arvind Jain (MEC 08)
Amit Birla (MEC 08)


A brief description of the project:

Traffic congestion is one of the worst problems in many countries. Traffic congestion wastes a huge portion of the fuel and creates environmental problem. INTELLI TRAFFIC CONTROL SYSTEM (ITCS) aims to make the present traffic lights on a crossing more effective and less time consuming. In our project we used Computer simulation which provides an appealing approach to analyze traffic flow & signal light timing. In our system we have touch sensors(on every lane ) on which when a car passes it sends a signal to computer.A software counts cars on each side and signals green light accordingly.

Underlying Principles / Technical Details

It uses parallel port to receive signals as well as it controls all the green lights.
There are touch sensors installed on each lane which when pressed send a signal to computer. There counting process through software goes on and accordingly it signals the green light.

Problems addressed by the envisioned product and the solution offered:

In normal traffic light system, the green lights are on for a specific period and sequence(for changing lights) is uniform. So whether there are 10 or 100 vehicles at any side the duration of green light remains constant which wastes a lot of time and money. Also if, of the four sides, if any one side is having heavy rush or relatively more traffic from other 3 sides then also the green light of that particular side is on for same time period as for other three sides, and it gets turn after a long time only. What our system does is.it removes this present fault.

A Step Forward…

The system here we are demonstrating is just a prototype. It can be upgrade easily to have some avant-grade features as…

• A micro controller can be used instead of a computer which reduces its cost and compactness to great extent.
• Interlinking of different crossing light systems having this feature is easy and can be a very effective tool for handling huge rush.
• This project can be modified easily to work for any other similar thing like parking area etc.

Mar 19, 2005 by Vibhav Agrawal MEC06
   This page last updated at October 26, 2005 03:43 PM GMT +05:00
Copyright © 2003-2005 by ITBHU.org
Institute of Technology, Banaras Hindu University
Varanasi 221005 INDIA